Cooling tunnel
Updatetime:2020-12-15 10:08:51 Views:


summary:
1. Before the hot filling bottle is put into the machine, it is input by multiple rows of conveying chains, and is led into the main drive chain through the guard plate and connecting plate; the bottle moves backward and water is cooled to make the temperature of bottle out below 35 ° C.
2. The spray process realizes the conversion between cooling tunnel processes, which ensures the outlet temperature of bottles and saves energy such as steam. Finally, the required bottles are output from the multi row conveying chain at the tail of the machine to complete the whole process. Block design, so that the conveyor chain installation and adapt to different workshop production line layout become simple and fast;
 
characteristic:
1. Compact structure, composed of rack, spray pipeline, water tank, conveying chain and other parts.
2. The conveyor chain belt has Rexnord DTS dynamic transition structure, which can effectively prevent the bottle from pouring and emptying in the tunnel.
3. The frame is welded by stainless steel square tube, which has the advantages of high strength, good rigidity, light weight, beautiful appearance and easy cleaning.
4. The spray pipes are connected by 2 "and 2.5" stainless steel pipes. The distribution of outlet holes is reasonable, the spray cooling effect is good, and the nozzle can be disassembled and cleaned. The spray pipeline is equipped with water temperature and water pressure indicator.
5. Each section has a return water tank. The water tank is equipped with a dosing funnel which can also be used as a filter to clean the water tank. The funnel is equipped with two layers of 50 mesh and 20 mesh leakages, which can be replaced and cleaned during operation without affecting the normal operation of the machine. The cover plate of the funnel is made of plexiglass, which can monitor the water level in the tank.
 
Main technical parameters:
1. Applicable bottle type: 300ml ~ 2000ml
2. Main drive: according to customer requirements
3. Chain width: according to actual size
4. Time consumption: Recommended: ≥ 18 minutes (adjustable)
5. Water consumption: 1 T / h
6. Host size: variable
7. Total weight: according to the actual size